配料工序操作流程

1目的

为保证原料、二次料、辅助料、按正确的配比,生产合格片材

2适用范围

配料工序

3内容

3.1按生产部下达的生产单中有关项目进行配比。

3.2用原料、二次料、辅助料,要划分区域摆放,使用时要掌握其准确性,配料所需的聚乙烯应用电子称称量。

3.3新料烘干:打开烘干机桶盖,按烘干机的功率,将原料倒入烘干桶内,然后加上添加料、辅助料,盖上桶盖,打开烘干机的电源开关,约十分钟后即可放出已烘干搅拌好的原料。

3.4检查二次料的卫生情况,是否有杂物或被污染,

3.5生产用原料制作:取出一定比例的二次料和配好的新料,打开烘干机桶盖,倒入烘干搅拌机内按下烘干机电源开关进行搅拌10分钟。

3.6时间到后,即配料已完成,放出已烘干搅拌好的配比料,装入干净料袋备用,反复3-6的规定再次烘干搅拌.

4相关文件

5相关记录

配料生产记录

6附件

配料工艺标准

图片列表 - 点击可放大
送花(0)臭鸡蛋(0)引用回复2019-07-12 20:40 [1楼]
会员 Tina123
等级:
上等兵
发帖:
2/68
积分:
172
经验值:
172
上次发言:
08-04 10:24

Operation flow of batching process

1. Purpose
To ensure that raw materials, secondary materials, auxiliary materials, according to the correct ratio, production of qualified sheet
2. Scope of applicationBatching process
3. Content
3.1 Match the relevant items in the production order issued by the production department.
3.2 The raw materials, secondary materials and auxiliary materials should be placed in different areas, and their accuracy should be mastered during use. Polyethylene needed for battering should be weighed electronically.
3.3 New material drying: open the drum cover of the dryer, pour the raw materials into the drying drum according to the power of the dryer, then add the additive and auxiliary materials, cover the drum cover, turn on the power switch of the dryer, and release the raw materials that have been dried and stirred after about 10 minutes.
3.4 Check the sanitary condition of the secondary materials, whether there are sundries or contaminated,
3.5 Production raw materials: take out a certain proportion of secondary materials and new materials, open the drum cover of the dryer, pour it into the drying mixer and press the power switch of the dryer to stir for 10 minutes.
3.6 When the time is up, that is, the batching has been completed. Release the proportioning material that has been dried and stirred, put it into clean material bag for later use, and repeat the 3-6 regulation to dry and stir again.